The
first picture in our gallery of Boathouse progress, shows the location
of where the new Boathouse will be built. |

This
is a pic showing the barge 'Deep Diver 1' arriving at Tenby on Tues
12th Aug '03 |

The
barge shown up closer showing large crane
|
Drilling
a hole for the pile to go into |
Drilling
a hole for the pile to go into |

Another shot which shows the hammer above the pile driving it in |

With the first pile in and the second one being drilled, a JCB moves
in to drill away some of the surrounding rock to make the pile drilling
easier |

The result of the JCB drilling away the rock. It should now be easier
to drill in the next pile |
3rd
pile has been lifted into place and now is a hole in being drilled
underneath |
Drilling
continues on 3rd pile |
Hammering
the 3rd pile in |
A shot
of the barge drilling taken from a plane |
A pic
taken from the ALB whilst on exercise showing the existing boathouse
and the location of the new one |
The
latest progress pic as of 3rd Sept. Pic shows 3 piles finished and
the 4th nearly done |
This
pic shows the 4th pile finished and the rig in position to start
putting the next in |